Abstract
Agile development methods have become a standard in the software industry, including in large-scale projects. These methods share a set of underlying assumptions that distinguish them from more traditional plan-driven approaches. In this article, we adopt Alvesson and Sandberg's problematization approach to challenge three key assumptions that are prevalent in the large-scale agile literature: (1) agile and plan-driven methods are mutually exclusive; (2) self-managing and hierarchically organized teams are mutually exclusive; and (3) agile methods can scale through simple linear composition. Using a longitudinal case study of large-scale agile development, we describe a series of trigger events and episodes whereby the agile approach was tailored to address the needs of the large-scale development context, which was very much at odds with these fundamental assumptions. We develop a set of new underlying assumptions which suggest that agile and plan-driven practices are mutually enabling and necessary for coordination and scaling in large-scale agile projects. We develop nine propositions for large-scale agile projects based on these new alternative underlying assumptions. Finally, we summarize our theoretical contribution in a generic process model of continuously adjusting agile and plan-driven practices in order to accommodate process challenges in largescale agile projects.
Original language | English |
---|---|
Article number | 33 |
Journal | ACM Transactions on Software Engineering and Methodology |
Volume | 33 |
Issue number | 2 |
DOIs | |
Publication status | Published - 23 Dec 2023 |
Keywords
- Large-scale agile
- assumptions
- case study
- literature review
- multiteam project management
- problematization
- requirements engineering
- software architecture